Construction projects in Tabidoo instead of Excel on a shared drive

A construction company ran dozens of projects in Excel files on a shared drive, billing milestones were rewritten by hand and construction documents kept getting lost. We built a project register in Tabidoo with phases, suppliers and milestones, connected it to Microsoft 365 for documents and set up an export to the accounting software.

Construction · Mid-sized construction company · Czech Republic · 6 months of implementation, ongoing service afterward

Construction
Key results
O tolik méně času dnes asistentka stráví fakturačními milníky.
40 až 50 %
Za tu dobu stavbyvedoucí najde dokument ke stavbě. Dřív to bylo i půl dne.
do minuty
Challenge

What was blocking growth.

The company ran dozens of concurrent construction projects in large Excel workbooks stored on a shared network drive. Each project had its own file, sometimes two or three depending on who on the team needed to pull something out. When two people opened the same file at once, one set of edits got overwritten. The site manager often did not know whether he was working with the current version or the one a colleague had edited two hours earlier.

Billing milestones were rewritten by hand into the accounting system. On Monday morning the assistant pulled the rows that had reached billing from each project Excel and copied them into the accounting software. It took four to five hours a week, and every month two or three milestones turned up that someone had forgotten to mark as done, so they were billed a month later than they should have been.

Construction documents (project documentation, supplier contracts, handover protocols, photo records) were scattered across e-mails, the shared drive and the site managers' phones. When an inspection or a complaint came in, finding a specific document could take half a day. For older projects, some documents could no longer be found at all.

Management had no overview of how much a project actually cost and what stage it was in. Reporting for the owner was done once a month by hand, every project was checked separately and the values from the individual Excel files were added up. Decisions about taking on a new contract were made without current data on the team's workload and the status of projects in progress.

  1. Verze

    Soubory se při souběžné úpravě přepisovaly a nikdo nevěděl, která verze platí.

  2. Fakturace

    Zapomenutý milník znamenal fakturu o měsíc později.

  3. Dokumenty

    Při kontrole nebo reklamaci se jeden papír hledal i půl dne.

Our work

From audit to controllable operation.

What we did

  • Audit
  • Document workflow
  • MS 365
  • System integration
  • Support and care

We started with an audit of project management and a mapping of what the construction company actually needs to track: the project, its phases, suppliers, materials and billing milestones tied to specific phases. Custom development would have been expensive and slow, so we judged Tabidoo to be the better fit. The low-code platform handles structured records with the specific attributes of the construction industry, and the client can later adjust the forms themselves without needing a programmer.

In Tabidoo we built a project register linked to phases, suppliers and milestones. Each project has its own record with a breakdown of phases, suppliers and materials are assigned to the phases, and every billing milestone has a status (planned, done, billed). Documents (contracts, protocols, photos) are stored in Microsoft 365 and linked directly from the project record in Tabidoo, so the site manager has everything one click away from a phone or a laptop.

Billing milestones are exported from Tabidoo into the client's accounting software in a structured way, so the assistant no longer rewrites them, she only checks and confirms. Management has dashboards in Tabidoo across the project portfolio: status of work in progress, billing planned for the next month, supplier workload. Reporting for the owner is generated on its own and no longer has to be assembled by hand.

  • **Tabidoo**: the core of project management, a register of projects, phases, suppliers and billing milestones - **Microsoft 365 and SharePoint**: storage for construction documentation linked to Tabidoo records - **Export to the accounting software**: structured transfer of billing milestones, the assistant no longer rewrites them
Outcomes

Measurable shift.

Six months after going live the company runs all of its projects in Tabidoo and the Excel files on the shared drive are gone. The assistant's time on monthly billing dropped by 40 to 50 %, milestones are not missed because the system watches them on its own. Site managers find a document for a project within a minute instead of half a day of searching through e-mails and drives. Management has a current overview of the project portfolio every day, not just once a month.

After the implementation was finished we stayed on in a service mode. The client consults us on form changes when a new type of contract with specific attributes comes in, and we are gradually extending the connection of Tabidoo to the company's other tools. The client stays with us even after the main contact on our side changed, which we take as confirmation that the system gives the company long-term value.

The capacity freed up for the assistant and the site managers goes into what the company really needs: more care for customers, faster responses to inquiries, better control over suppliers. The owner can focus on winning new contracts and on strategic decisions, because he has the current numbers in a dashboard, not on Monday morning at a meeting.